Start with existing conditions
A complete replacement proposal begins with a review of the building and its existing roof. LCR reviews the existing system, accessible conditions, drainage concerns, rooftop equipment, and the building’s use. Available plans and prior roof records help establish the starting point. We identify any areas that require further investigation and explain how they may affect the proposed work.
Define what the replacement includes
The scope should address removal or any proposed recover approach, substrate preparation, insulation, membrane or metal roofing, flashing, perimeter details, and project cleanup. Whether a recover is appropriate depends on existing conditions, project requirements, and applicable rules; it is not a default substitute for tear-off. Material and attachment choices are established for the specific roof.
Keep building operations in the plan
For an occupied property, staging and sequencing matter. Discuss delivery access, parking, work areas, rooftop equipment interfaces, tenant schedules, and sensitive interior operations before installation. LCR coordinates these project requirements with the property team so the proposal reflects the work needed to execute the reroof.
Evaluate the complete proposal
Compare the specified system, insulation, drainage details, exclusions, access assumptions, and treatment of concealed conditions. Ask which warranty terms are proposed and what maintenance obligations apply. Review the complete scope alongside the price to make an informed comparison. Request an assessment for a commercial property in Lubbock, the Texas Panhandle, or West Texas.
Questions about commercial roof replacement
How much does a commercial reroof cost?
Cost depends on size, existing layers, access, deck conditions, insulation, roof details, and the selected system. LCR prepares project-specific proposals after reviewing the scope.
Can my business stay open during replacement?
That depends on the building and work involved. Discuss tenant operations and restrictions during planning so installation sequencing can account for them.